The project at Mehlville R-IX School District is a multi-phased project covering several facilities: a central administration building, an interior and exterior demolition package including assessment of existing infrastructure, and addition and renovation to several facilities.
The central administration building is a 2 story, 50,000 square feet facility adjacent to Mehlville High School campus. This building will have offices located around the exterior for access to views and natural light. Each private office and conference room will be situated along the perimeter of the building with full-height side light, allowing lots of natural light to filter into the building.
Phase 1 includes construction of the lobby, new interior stairs, a kitchen and cafeteria upgrade, and several offices for IT and the business staff. There will be a central computer space, dedicated business office, human resources space, mail room, and even a print shop, along with general interior updates to elevators and toilet rooms.
Phase 2 includes the Board of Education Room fit with a flexible folding partition. This space can also function as a staff training room. Additionally, there will be a welcome center, modern administration staff offices, and numerous conference rooms.
The new Herscher Intermediate School is set to transform daily life for students, families, and the entire community. Outdated intermediate and underutilized high school spaces are being updated by a single, purpose-built facility—bringing everyone together under one roof for a safer and more connected experience.
The Bloomington Area Career Center has a fresh identity and a bold new future. Now rebranded as the Bloomington Career Academy (BCA), District 87’s reimagined workforce development program is stepping into a modern era.
With a building of over 175 years old, Springfield PSD was looking for renovations to bring existing conditions back to its original state of the art facility standards.